From: route@monster.com
Sent: Thursday, April 07, 2016 11:49 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Project Controls, Construction Management, Contract Management SREE LAKSHMI
BURAVALLI (“SREE”) Houston, TX Direct: 832 795
9899 Email:
sreelu_12@yahoo.com SUMMARY · More than 6.5 years
of experience in Project Controls, Project Management and Planning in the
Engineering, Marine and Construction Industry. · Proficiency in
Primavera versions P3/P6, Sage CRM’s Timberline 9.6.0 and MS Project. · 6.5 years of
experience in Scheduling, Costing and Estimating. · Experience with
work-breakdown-structure (WBS) development, Critical Path Method (CPM)
schedule development and maintenance and schedule analysis. · Ability to work as
a team member, contributing to the overall program development by
participating in group discussions in areas of expertise as well as a
self-starter who is able to work with minimal direction or supervision. EDUCATION VANDERBILT
UNIVERSITY, NASHVILLE,
TN
Aug 2006 –
Dec 2007 Masters of Civil
Engineering (Construction Management)
SV UNIVERSITY,
TIRUPATI, AP,
INDIA
Nov 2001- May 2005 Bachelors of
Engineering (Civil Engineering)
SOFTWARE SKILLS: MS (Word, Excel,
Project), Prolog, Primavera (P3/P6), Timberline (9.6.0) EXPERIENCE IN
DETAIL Gulf Copper Energy Services,
TX
Feb 2013- Current Scheduler · Assist with project
planning and establish schedules · Maintain schedules;
assure schedules support overall construction deadline. · Conducted plan
reviews and site visits to assess/confirm program progress. · Built schedules
based on man-hour estimates. Projects
participated in: 1. Heerema Marine
Contractors 2. Chevron TBT 3. Axon 4. GE Hydril Stacks 5. Byford Dolphin
Stack NC Sturgeon LP,
Odessa,
TX
May 2009- Jan 2013 Asst Project
Manager/Scheduler/Project Engineer · Assist with project
planning; establish schedules, coordinate job set-up, coordinate utilities
and obtain building permits. · Set up and maintain
logs for contracts, applications for payments, equipment and material deliveries,
RFIs, change orders, submittals and shop drawings. · Responsible for
quality control review and documentation, including verifying that all
completed work complies with applicable codes, drawings and specifications. · Prepare and
disseminate all required documentation records. · Interpret
design/drawings for crafts installing material; review and coordinate
subcontractor submittals and RFIs. · Provide technical
support for construction effort including participation in construction
planning and design; interpretation of design and application of construction
methods. · Represent company,
project and/or department during A/E, client and project management meetings.
· Coordinated the
preparation and issuance of schedules, cost and schedule reports, problem
analysis reports, variance reports, and milestone reports. · Performed concrete
and steel take-off’s using Timberline 9.6.0 · Conducted plan
reviews and site visits to assess/confirm program progress. · Contract
administration includes preparing and reviewing all agreements of jobs
personally closed to ensure that the scope of work bid matches terms and
conditions of the contract. · Coordination and
management of project set up and start up, pre-job conferences, job site
meetings, submittals and all project management activities. Projects
participated in: 1. ENERGY: (CAB
Expansion, Travel Path, CRDB, TSB) at LES and Cudd Energy 2. HEALTHCARE: Midland
Women’s clinic, Doctors’ offices for Gundlapalli, Ganta, P.J.Patel. 3. RELIGIOUS: Our Lady
of San Juan, St. Stephen’s, Holy Redeemer 4. COMMERCIAL: Big
Brothers Big Sisters, City Pipe, Western National Bank, Village Farms,
Waukesha Pearce Industries Gayatri
Construction and Infratech Pvt Ltd,
India
April 2008- October
2008 and
June 2005- December 2005 Project Engineer · Performed all cost
engineering, planning, scheduling, and document control activities for
designated projects. · Assisted in the
selection and implementation of the cost management system to be used on the
project. · Participated in the
Preparation of various cost reports, such as percent complete, productivity
analysis, man-hour summaries, and progress reports. · Participated in the
review of cost estimates and change order estimates from contractors to
ascertain reasonableness. · Coordinated the
preparation and issue of master schedules, problem analysis reports, pre-op
schedules and milestones, etc. Primavera P3 was used extensively. · Developed Project
Schedules by reviewing plans and specs, discussions with designers and
Construction Managers detailing all work to be accomplished. Turner Universal,
Nashville,
USA
Jan 2007- June 2007 Project Intern · Core
responsibilities included setting up schedules and calling subcontractors for
specific bids sent out by Turner for VMC and other newer projects. · Prolog was used
extensively for project management · Extensive
interactions, discussions and meetings with the site superintendent, project
supervisors and managers to access the overall picture of construction
progress. Projects
participated in: Extension to Vanderbilt Medical Center, Nashville 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Hindi |
Intermediate |
|
|
Telugu |
Fluent |
|
|
|